Essential details:AO2040 -Fidas24 Ex Continuous gas analyzers
Installation
The following requirements and conditions must be adhered towhen installing the gas analyzer and the gas lines.
Installation site requirements
The unobstructed exchange of air with the environment mustbe possible around the gas analyzer. The gas analyzer mustnot be directly covered. The outlet and the pressurecompensation vent of the purging and monitoring unitFS870S may not be closed.
All of the plastic and elastomer components of the housingmust be protected against Uy radiation.
Requirements for models ll 3G /Gb and ll 2G/GbThe housing must be protected against brush discharges orelectrostatic charging; the housing may only be cleaned witha moist cloth.
Requirements for the Models ll 3D/Dc and ll 2D/DbDue to the risk of electrostatic charging of the paintedsurface of the housing, the gas analyzer A02040-Fidas24 Exmay not be installed in areas with an increased risk ofcharging (e.g.near filling systems).
Suitable measures must be taken for the blow-off vent (inertgas outlet) of the purging and monitoring unit Fs870s, inorder to prevent a zone elevation, due to dust being stirredup.
It is preferable to evacuate the ignition protection gas into adust-Ex free area.
The operator must install a suitable key switch, in order toconfirm that the interior of the housing is cleaned beforecommissioning,refer to connecting the key switch onpage 49.
The operator must ensure that the inside of the housing iscleaned of dust before the gas analyzer is switched on.The initial purging of the housing is not intended for thepurpose of cleaning the housing!
lf you need to inquire or purchase ,please send the product models to my email or call medirectly .
sunny He
[Email] sales@xiongbagk.cn
[Mobile]Â 86-18059884797
[WhatsApp] 86-18059884797
[Skype] sales@saulcontrol.com