On June 30, 2023, the water diversion ceremony of Junshan Dike water replenishment Project in Junshan District of Yueyang City was successfully held on the beautiful Dongting Lake. This is an important measure for the construction of water conservancy infrastructure in Junshan District, aiming to consolidate the water conservancy infrastructure of the whole district and improve the capacity of flood control, water supply, food and ecological security. This water transfer ceremony not only marks an important stage achievement in the construction of the Junshan Embankment water refill project, but also shows the important role of Otto’s high-quality high-pressure soft start device in the project.
“Jingjiang Gate” water pumping vessel
At present, the longest length and deepest type of water intake pump ship in China
Junshan Dike Water replenishment project is the key project of the second phase of the dike water replenishment project in the north of Dongting Lake, which aims to solve the irrigation and domestic water problems and ecological water replenishment problems in Junshan Dike. After the completion of the project, the irrigation water diversion flow will be expanded to 5.11 cubic meters/second, and the urban water supply scale will be expanded to 60,000 tons/day, providing solid support for local water resources allocation.
As a partner in the project, Otto’s high voltage soft start unit plays an important role in the operation of the pump station. Through advanced soft start technology, the safe and smooth start of the pump is achieved, which protects the safety of the related equipment, avoids the impact of the motor on the grid when starting, improves the stability of the grid and ensures the safe operation of the pump station.
During the water opening ceremony, the Otto team, together with the Junshan Pump Station customers, toured the on-site facilities and witnessed the magnificent views of this magnificent pump station. At the same time, the customer also expressed trust and satisfaction with the performance of Otto’s high-voltage soft start devices and expressed their desire for future cooperation. Otto will continue to strive to innovate and enhance its capabilities to provide customers with better services and solutions.
The successful operation of the Junshan Yuan water refill project has proved the important role and value of Otto’s high-pressure soft starting device in the start-up process of the pump, and has provided a powerful reference for the transformation and upgrading of other pump stations. For those who care about the safety and stability of the pump operation, choosing Otto high pressure soft starter is definitely a wise decision.
Otto will continue to be committed to continuous innovation and improvement to provide customers with better services and solutions. Let’s look forward to more Otto pumping stations in the future!